Test bench with 30 MW loading device
Manufacturing. Test benches with application of loading device (turbogenerator, hydraulic brake) with capacity 30 MW.
We calculate, with the subsequent manufacture and delivery of “turnkey” test site for testing and running-in gas turbine engines and units of high power, up to 26 MW and more.
Development of the required test bench configuration.
Software development.
Technical support in the process of operation.
All options and your suggestions are subject to discussion.
In order to increase the speed of processing the application, we ask you to prepare the TU of testing of this or that unit beforehand.
Our company has experience in manufacturing gas turbine engine test benches for customers from Russia and customers from South Korea.
All questions will be answered by an engineer-consultant.
All the necessary information, photos, schematic images, technical details – we transmit after receiving the official request and confirmation of interest and availability of funding for the project.
Manufacturing.
We calculate, with the subsequent manufacture and delivery of “turnkey” test site for testing and running-in of high-speed gas turbine engines and units of high power, operating at nominal modes from 1 MW to 26 MW. Test
stands using hydraulic dynamometers (hydraulic brakes) with capacity from 16 MW to 30 MW.
Development of the necessary configuration of the test stand, which will reproduce all operating parameters of the unit under test as accurately as possible.
In order to increase the speed of processing the application, we ask you to prepare the TU of testing of this or that unit beforehand.
We conclude the contract and perform the work with the delivery of the test site in full, “turnkey”.
We carry out the works in any country of the world.
All questions will be answered by an engineer-consultant.
All the necessary information, photos, schematic images, technical details – we transmit after receiving the official request and confirmation of interest and availability of funding for the project.
Manufacturing.
Stand for industrial GTD DU80L1 used in gas compressor stations and power plants.
Models: DU80L1, DU80 (GPA-C1-25C) and others.
Complete set of the repair enterprise is possible in two directions:
Manufacturing of a test bench for test running-in and testing of industrial GTD DU80L1, DU80 (gas turbine engines).
In this case, different versions of the test bench are used, both in terms of configuration of components and power.
2) Manufacturing of a set of test stands required for checking and testing of all mounted units of pneumatic, hydraulic and fuel systems used in gas turbine engine DU80L1 (GTE).
In this case, there are various options for placing a set of test stands, namely, stationary or modular.
In order to increase the speed of processing the application – we ask you to prepare the TU of testing of this or that unit.
All questions will be answered by an engineer-consultant.
All the necessary information, photos, schematic images, technical details – we transmit after receiving the official request and confirmation of interest and availability of funding for the project.